Civil & Build engineering work / electrical & IT communication work, Airport・Aviation Design & Construction
Overseas construction results
Jan 2019 Lukla Airport
This is our first overseas project.
Installation construction of solar power generation system and runway lighting equipment was carried out.
Although it is known as a dangerous airport, it was a very enjoyable site thanks to the villagers, airport staff, and project members.
In the excavation process, there were many stones only at the foot of Everest.
Mar 2019 Jumla Airport
Jumra is a town in the Midwest that takes two days to transfer from the capital Kathmandu.
At this airport, a woman was the chief of the airport.
Construction was done with the Hinomaru raised.
Mar 2019 Lara Airport
In addition to the local workers, the donkey (also called Donki locally) who is a transport worker is working hard.
Apr 2019 Jomson Airport
The site is still rocky, but the mountains of Nepal are very beautiful.
It was a sloping site, but the workers in Nepal are strong and will not overwhelm manpower operations. We will pile up stones and rocks to make it flat.
Since the formwork does not have a separator, it is supported and molded with backfill soil.
Nov 2019 Simicott Airport
I made the people of Nepal learn Japanese politeness. I'm surely growing while saying "Do not move the thread" many times. The top adjustment of the foundation is also outstanding!
It is the result of a very large cooperation system. I am grateful to have been able to participate and to get to know good members.